Thursday, March 27, 2014

Thoughts, ideas, solutions?

Lots going on in the garage of psychological disorders and progressive music.  First, the floor of the trailer was sealed with a nice coat of white enamel.  It's beginning to look like a real project here.  I suppose I should be thinking about flooring choices at some point.  The stepdown and the entry will be done in vinyl and in front of the gaucho as well as under the dinette will be in carpet...at least that is the thinking for now.  I'd like it to be comfortable where it should be comfortable and easy to maintain in the traffic areas.  I sound like a carpet store commercial!

Shockingly professional looking!
It's a nice industrial product...and it looks ok, too.


Before I can get the walls up, I need to get the cabinetry finished out.  The veneer will come shortly but for now, it's time for the some woodwork.  Since both the nightstand and the galley have different requirements, I'll start with the one nearest the door. 


Long storage cupboard for hot dog or marshmallow roasting sticks
Bookcase facing the gaucho
Detail of bookcase showing trap door
Semi-secure storage for keys, wallet, Pop-Tarts, etc!



Now this is where the going gets tough.  I salvaged the original stove and sink reserving them for possible re-use.  Originally I had thoughts of using the SMEV917 dual-burner stove and sink combination but between the price and the difficulty of importing one (it's available in the U.K. and Europe but not exported to the U.S. at this time), I have had to consider other options.  Since full meals will not be prepared in the trailer and the stove will only be utilized for the occasional boiling of a kettle of water, I have come up with a plan that will do the trick.  In order to return the original sink to good trim, it would be necessary to re-enamel it, a $200 prospect. The original stove would need the same treatment and perhaps new valve and orifice components.  Sizing things up with the new galley cabinet (which is slightly smaller than the original in order to accommodate a full-size mattress), a smaller stove is necessary.  By sheer luck, I landed this stainless sink for $15 and my costs for the stove will about $25.  Beats $225 + import tariffs.

A little Barkeeper's Friend and it'll be like new!
This should be easy to adapt

This Saturday will find me cutting openings for the drawers and getting the drawer glides in place.  Next week:  WALLS!  Oh, wait....welting!  I have to get my welting!

Tuesday, March 18, 2014

It's alive.....It's alive!

I've been making lots of sawdust over at Greg's garage and thinking big thoughts....let's see what's taken place over the last few weeks!  First, thanks are in order to Podiatrist Dr. Rigby and Physical Therapists Nathan, Russell, and Brian for the top notch care they've given me and my foot.  I'm making good progress and it's making walking and moving about in general much better.  I just hope the bill doesn't send me into cardiac arrest!

Little twinkle toes!


In order to strengthen the connecting joint between the floor and the walls, I cut and attached a cleat along the sides of the floor.  It will be hidden after the cabinetry, dinette and gaucho are permanently in place.  I also marked where the grille in the entry floor will be located.  This will be cut in at some future point - I'm still uncertain if I want to do this.  Cutting a hole in the floor is not something I would do without a lot of contemplation!

It might look quite handsome....
....but I'm still considering it.  Maybe.  Perhaps.  What do you think?


Ok, now down to the nitty gritty.  The same day two weeks ago that I attached the cleats and measured for the grille placement, I measured for the galley and nightstand cabinets.....and I measured......and I measured some more.  Even then when the time came to cut the material at Greg's place, I was still concerned but it was time to get to work.

Lots of cutting (old curbside seat riser in the foreground w/ rusty nails!)....
....lots and lots of cutting!
After so much cutting, lunch is in order!


OK, now to see if and how all these pieces fit together...

So far, so good
I'm feeling pretty good about this!
The galley about to be fitted into place


Well, time to bring the goods home for final fitting and placement...

Ok, it all seems to be right....how did I do that?
Yet there was one error but if I don't mention it, it won't be seen!


I was running out of daylight fast even with the extra hour of light we now have.  I'm now driven - I must get the seat profiles cut!  I was able to salvage them when the trailer was deconstructed a year ago and now it's time for them to come into play!

A familiar profile to Scotty enthusiasts!
Success!
Cabinets located and the curbside dinette seat riser in place


Of course, there are still the openings for the drawers in the galley and book shelf spaces in the nightstand that will need to be cut in along with the necessary support pieces.  That will come over the next few weeks.  I suppose my next major step will be selecting and installing flooring material.  One of my friends suggested ceramic tile......I think I'll go with something a little more apropos for camping.  Those silly friends!

I detect camping season is not far off...


Late breaking update:  I had to make a trip downstate and while passing through Salt Lake City, I picked up the material for the walls - 5' x 5' white birch plywood panels.  The cabinets are at the mid-point of each panel which will assist in the joining of each half of each wall.  I know the Scotties interiors were painted turquoise with black and white flecks but I think the golden glow of that era is so much more inviting.  Now I'm REALLY motivated to get that flooring done and soon so I can start on the walls!!!

I can see the golden glow already!!

Saturday, March 1, 2014

Eleven Bolt Day is here!!

Soooo....what should I do today??  Install the wheelwells?  Flip the floor?  Bolt the floor down to the frame?  All of the above?  Let's go!

The first step was to ensure the slots between the rim joist and the floor were clear of the waterproofing compound.  Both sides required attention as well as removing a little wood from the opening in the floor - the wheelwells are 31-1/2 inches long and with the new flanges, I should have enlarged the openings slightly before I flipped the floor over for waterproofing.  Once I modified the rear edge, the wheelwells slid into place with minimal effort.

Partially installed streetside wheelwell

Fully installed; time for fasteners


As I mentioned in an earlier posting, I had to drill out the lower rivets and then secured the wheelwells with 1/2" washer head screws and also along the perimeter of the flanges.  It wasn't long and both wheelwells were in place.

Streetside....

...and curbside


It was time to flip the floor over and place it back on the frame.  Thanks to Aaron, Aaron, Ammon, Mike, and Hal.  Of course, I was a little busy so it was a bit difficult to photo-document the process of flipping the floor over.  Following some quick instructions, four of the guys lifted the floor up high so two others could first remove the five-gallon buckets and then move the $60,000 sawhorses over to the other half of the garage.  The floor was then lifted sideways and set on the crates.  We readjusted our grip then flipped the floor over and set it back down.  After conferring briefly, the guys lifted and moved the floor over to the frame while I crawled under to ensure the floor went into place correctly the first time.  No fingers were pinched in the making of this move!

Insert hardware.....$12 worth!

The $60,000 sawhorses becomes mock-up dinette seating


What's in store next?  Cabinetry?  Floor covering?  Walls?  I can hardly wait!

Wednesday, February 26, 2014

What weighs less than a duck?

Waterproofing in progress...hide the women and children...

...or at least keep the kids away from the tar!

Half way done....

....one coat later.  And even better, none of it on me!


Before the sealant has had time set up firm, it is time to install the flashing and brackets to the stepdown.  I'm confident from how the flashing was imbedding into the tar that this will minimize the risk of roadspray injection through the joints. 

Careful fitting will pay dividends

Too bad this won't really be seen when everything's finished


I wonder how long it will take for the sealant to cure to work on the installing the wheelwells?  I wrestled the floor up higher (three $60,000 "sawhorses" + three empty 5-gallon buckets = 42 inches off the floor) to give me just enough room to begin the Battle of the Wheelwells.  Saturday would be a good day to get them put in place and anchored.

This process is being very carefully supervised.....

....Bella the Basset Hound!


Eleven Bolt Day is coming!

Tuesday, February 25, 2014

Happy Birthday to Scotty!

It's been one year since I traveled out to Vernal and bought the trailer and what a year it's been!  The Scotty has been completely reduced to individual trailer molecules and is now, one day at a time, undergoing it's metamorphosis.  I picked up the freshly-painted wheelwells last night and will install them as soon as I have the underside of the floor waterproofed.  Also, the soon-to-be-installed floor vent looks "grate"!  :-)

Roger does good work - hopefully I can install them as artfully!

All I can say is "Wow!" - the photo doesn't do it justice


It's moving along slowly but as another 1960 Scotty owner put it:  "It's not the destination".  To celebrate this special occasion, the propane tank ring which I ordered three months ago arrived on the doorstep today!

It won't take much to get this installed - probably on Saturday.


I don't have any idea what our trailer's real birthday is but to me, it's Happy 54th Birthday!

Saturday, February 22, 2014

One bite at a time....

I guess I'll deal with these bone spurs one way or another but let me tell you, it kind of puts a cramp in my style to have this anchor strapped my foot.  I can get around OK but simple things like kneeling or driving the car are a bit more arduous.  And that electrical thingie they use during physical therapy is something I'd rather do without so it had better be worth the discomfort.

High-fashion footwear it ain't!


My friend Lance came over last night and helped me move the floor over onto the $60,000 sawhorses.  These crates are the perfect size so I'm glad I held onto them after their intended use was finished.  One more would be nice, both as a sawhorse but also if I had the use of what was enclosed in it at work.

Imported from Hackett's Cove, Nova Scotia...

...from this building right here on the shore of St. Margaret's bay


Before I proceed any further I needed to cut a slot between the floor and the rim joist.  This will ease the installation of the wheelwells when Roger is done painting them.  I will have to drill out the lower row of rivets and replace them with 1/2" washer-head lath screws.  The mandril end of those rivets will be at an interference fit with the floor unless I drill holes and slots for clearance when the wheelwells are installed.  Since the rivets are there to hold the flanges to the wheelwells (secured with flashing adhesive) and since there are two rows of rivets, replacing the lower row with screws will help secure the wheelwell to the floor while replicating the functionality of the rivets.  Anyway I look at it, there will be extra labor involved but this option seems to be the simplest.  I wish those flanges could have been attached with the spotwelder but when all is said and done, it won't really matter. Just one of those hurdles that all good projects seem to encounter.

Widening the joint between the rim joist and the floor

Test fitting with a scrap of flange material


Moving the floor off the frame and over onto the crates prior to this morning's painting adventure. 

Made sure things were positioned just right first before eating pie!

Ready, set, paint!

3/4 of a gallon of enamel later...doesn't look half bad!

If you look closely, you'll noticed I've removed the stepdown brackets in order to more completely apply the waterproofing compound and then reinstall them when the tar is done setting up.  I will also be installing angle flashing to protect the joints of the stepdown from road spray injection.  With that in mind, I will be installing the wheelwells after waterproofing compound is applied and then the flanges will be sealed to the floor.  This way, if the flange material should warp with heat or cold, the integrity of the waterproofing will not be compromised creating the potential for a leak in the floor.


Is it a safe week to park the car in the driveway...or am I tempting fate?


Monday, February 17, 2014

A-riveting we will go....

Since spot welding the new flanges onto the wheelwells ended up a bust, I went to Plan B:  Pop-riveting.  The only drawback here is the need to drill reliefs for the mandril end of the rivets wherever the tail end of the rivet will be flush with the wood frame or walls.  Oh well, let's see what happens here....

Starting with the curbside fender on the inside edge

Clamping so the holes all line up to minimize any puckering along the edge

Same wheelwell, different view

Looks like I'm on the right track!

A couple of beads of flashing sealant and nine rivets later

Leading and trailing edges complete

A tire's-eye view

Lather-rinse-repeat

The outer side - this will be cut to match the relief in the wall later

Reversed for comparison - showing the soon-to-be trimmed relief


It's time to load these up along with the floor register and take them over to Roger's place for a fresh coat of paint.  Soon it will be time to install the wheelwells into the floor followed by some waterproofing action!